abrantes_6

Abrantes

abrantes_1

Project

Employer: SMAS – Abrantes
Deadline: 180 days

Abrantes Water Supply from Albufeira Castelo de Bode – supply the South bank – Trace Pipeline System Between N13 (existing) and the weir in the River Tagus.

lisboa_3

Lisboa

lisboa_3

Project

Developer: Lisbon Municipality
Deadline: 90 days

Construction Cycle Lane